What is Current Shuttering rate (labour + materials) for Columns, Beam & Slab on Item rate basis ?
Answer Posted / surajitg
Labour cost is around Rs. 550.00 per cum of concrete and shuttering (clients shuttering) labour cost is Rs. 220.00 per Sqm.
| Is This Answer Correct ? | 31 Yes | 21 No |
Post New Answer View All Answers
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
what is cross hair cursor?
Where is the worlds longest elevator and how long is it?
What is Grid floor and mention its advantages ?
What do you mean by bond? What are the different types of bonds?
What are the benefits of rcc pipes over steel designed pipes?
List out the types of roofs?
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
How to calculate quantity of plum masonry in 1:3:7
What is meaning of tlc
how to disign cuplock shuttering and it's matireal requirement snd any related web site
how to calculate freeboard in under ground water tank and technical details
how many shuttering material required for 1000 sq.m built up area.
In reclamation works what are the importance of geotextiles and sand?
List out some of the software program that can be useful for architect?