What is Current Shuttering rate (labour + materials) for Columns, Beam & Slab on Item rate basis ?
Answer Posted / surajitg
Labour cost is around Rs. 550.00 per cum of concrete and shuttering (clients shuttering) labour cost is Rs. 220.00 per Sqm.
| Is This Answer Correct ? | 31 Yes | 21 No |
Post New Answer View All Answers
Why is concrete cube test carried out?
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work
What are the common ways of demolition?
What will you do if you encounter problems like accidents?
to minimize budget cost of building , what can i do
What black man invented the clothes dryer?
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
The portion of a brick cut across the width is called?
How many % we consider for lap for reinforcement for estimates
Hi.. Can i get hel in finding HPCL previous year question paper? plz help me in finding thiss..
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
What is diversion tunnel in a dam?
What you understand by building codes?