If the first roof slab is not deshuttering in this time shall I start column raising work in second roof is it correct or not
Answer Posted / surajitg
Yes from the very next day you can start work over the roof for the next floor. Provided you take care of the newly concreted surface from getting damaged and water ponding for proper curing.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
how much required strength of cement concrete bricks(size 230x115x75mm)
What is zoning permit?
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.
residential projects,structural.
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
What is the strongest bridge for a school contest?
Mention different types of roof systems?
What is proportion of PCC Grade G?
List out some of the software used in the construction sector to estimate cost and monitoring expenses?
Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method
How you can use different dimension tools in cad? What are the different dimensions available?
What is soil enforcement?