Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

If the first roof slab is not deshuttering in this time shall I start column raising work in second roof is it correct or not

Answer Posted / surajitg

Yes from the very next day you can start work over the roof for the next floor. Provided you take care of the newly concreted surface from getting damaged and water ponding for proper curing.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?

1855


what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter

2503


Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards

2029


relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2

3001


calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick

1802


The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?

2233


How much material is required for constructing a 2 Lane 2Km rigid pavement road

2200


What is the difference between undo & redo?

1278


i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr

2027


What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?

1906


Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??

2716


what is the clear cover for shearwall?

1620


How to calculate cement and river sand material Qty for waterproofing base coat and finish coat

2413


whaat is blister in box girder bridge and what is its function..

4936


If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in

2018