what is diff b/n sm50 and sm66 with explanations and
screenshots
Answer Posted / vinay
SM 50 gives you the detail of all process in SAP under a
particular server let it b bckgrnd or any process
SM 66 gives a detail of global workprocess wit all detail
as since when it is running and other
(or)
SM50 used to monitor instance specific workprcesses.
SM66 to monitor workprocess of all instances.. but here we see long running processes only. here we monitor the memory flips.
in SM50 we monitor NAME OF THE USER, PROGRAM,STATUS OF PROCESS, REASON FOR THE STATUS, ACTION ON THE DATABASE, CPU UTILIZATION
(or)
in sm50 t-code we can see only local system workprocess n in
sm66 t-code we can see global system workprocess mens in our
landscape all system workprocess we see
(or)
In SM50, we can see the available work processes means which
are in waiting status for an instance only.
In SM66, we can see all the work processes which are running
or stopped but not waiting for all instances. Means used
work process.
(or)
sm 66 also you cal the work process
(or)
SM50--used for local work processes
SM66--used for global work process
main advantage of sm66,it displays the workprocess consume memory,
we can kill the work process in sm50, it is not possible in sm66
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Is system user sap basis consultant and dialogue user other user like fico, hr, mm user?
How you can assign an object to 100 roles at time?
Where is the Deletion Flag or Indicator used in archiving process?
How to deactivate IPC in standalone CRM.
what is role of sap administrator in pi & ep?
What is business kpis ?
What is the procedure to applying patches?
Mention what is the purpose of table usr02?
How to delet a table in sap. How to move a table from one location to another.
How to transport objects from Production to Development?
How to apply java stacks ? expalin step by step prcoess
Have you done any parameter changes using configtool and visual admin tool?
What are the regular activities u do in solution manager and how
At os level how you can change the number of work process? How you can analyze the status of work process at os level?
Mention the use of personalized tab and parameter tab in user master record?