If the first roof slab is not deshuttering in this time shall I start column raising work in second roof is it correct or not
Answer Posted / shadavali123@gmail.com
It is the no matter you without tension can work column second roof after 1day only column
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what else we can add rather than admixture in concrete to reduce the cement quantity?
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
why we can use dust in concrete insted of fly ash
what is the water-cement ratio of mix design while 30mpa in 7 days?
strength vs shape factor
In earth work 1300 cum soil how to calculate how many liters require in water
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
How do you calculate the power of a centrifugal pump?
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
Does brick grows bigger every year?