Answer Posted / tarak patel
500 no of bricks required..
| Is This Answer Correct ? | 18 Yes | 2 No |
Post New Answer View All Answers
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
what are the types of design? which type of method is used at what type of design & why?
Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??
How much cum. Brick work can do by 1 madon
What in bending moment, if a moment is free end of cantilever beam?
Slump Values for works?
how many minimum admixtures are used in water froofing structures
List out some of the common problems that architect have to tackle it?
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
how to find hardness of water?why it should be determined?
Explain the advantages and disadvantages of using plastic and timber fenders?
Why reinforcement done in shorter span in two way slabs
what are the challenges of being a team leader and a supervisor?
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?