Answer Posted / tarak patel
500 no of bricks required..
| Is This Answer Correct ? | 18 Yes | 2 No |
Post New Answer View All Answers
Prepare a Schedule for a Highrised building from starting stage to Handover?
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
Define What is an ice dam sock?
what is detail procedure of eccentric footing? plz. give solved exmple?
what are the five benefits of using standard terminology in the measurement process?
usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will give if you use machine crushed stone in place?
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
How many days should curing of plastering, brick work and concrete
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
How can explode a block?
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.