During estimation of walls of superstructure...which unit we'll use with quantity.cube or square
Answer Posted / mohammed sanaulla
practically brick work is done 2 ways i.e 9"thickness wall & 4.5"thickness wall.
9"thickness brick work is done for outer wall or main wall and 4.5" thickness brick work is done for partition wall.
9" thickness wall we considered as cu.m(workout for brick work contractor)
4.5" thickness wall we considered as sq.m(It will not workout for any contractor if it is done in cu.m)
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?
what is the name of shuttering oil used in oman
what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15
How do we determine the specific gravity of a cement?
How many pyramid in egypt?
what is density of 20mm coarse aggregate.plz send answer my below adress e.mail
How to do rate analysis for concrete work including shuttering work?
Why is concrete cube test carried out?
sir how can we find the cement and sand required for making 4" drop
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
What is bmc stands for in bmc software?
Define different types of roof systems?
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
undistributed samples are obtained by
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard