What should be the Slump(Min.)in cement in concrete in all
grades of concrete?
Answer Posted / sahilshah.civil@gmail.com
Minimum slump for any grade of concrete for any section/structure as describe in clause 7 of IS 456:2000
25 to 75 mm
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
what are the duties of Site Engineer in work site?
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
Explain the importance of moment of inertia?
What are the alternate material for steel, Sand and aggregate
material used for mendrel use to bend epoxy coated rebar
why top layer of block work shoud be full size if any cut block adjustable than another layer?
how to find out hard strata in bored pile when the DMC method adopted.
1:4:8 pcc calculation 591 cu.ft
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
Why should you consider yourself fit to be hired by jindal steel.
In which code the the maximum height of concrete casting has been explained
How do you measure water flowing through 300mm diameter pipes?