Answer Posted / mahesh
PD : Mrp planning. explote the BOM upto last level and create the planned oder from finish product level to raw material level
MO : Master schedling planning : the BOM upto next level of the final product.so create the planned order for the final product and create depended reqmt for the next level material
MRp Type P1 or M1:
Ans: THe order proposal that lies within the planning time fence is firmed automatically as soon as its date lies at least one day before the finish date of the planning time fence. The date of new order proposals that are actually created in the planning time fence are rescheduled out to the end of the planning time fence. Therefore, these new order proposals are not firmed
MRP type P2 or M2:
Ans: An order proposal that lies within the planning time fence is automatically firmed as soon as its date lies at least one day before the end of the planning time fence. The system does not create any new order proposals within the planning time fence. That is, the shortage situation is not adjusted within the planning time fence.
MRP type P3 or M3:
Ans: Order proposals that lie within the planning time fence are not firmed automatically. The order proposals required to cover the requirements are moved to the end of the planning time fence
MRP type P4 or M4:
Within the planning time fence, the system creates no order proposals automatically. That is, the shortage situation is not adjusted within the planning time fence.
M4 is to classify the MS parts and P4 is for normal MRP items. BOm will be exploded in both cases to lower levels if procurement proposals created within or outside the time fence.
VB/VM - here , the system do not consider the reqmt (pir or sales order ) , it check the reorder level in the material master and create the planned orde / pr once the stock reach the level.
ND : no planning . so the material will not be consider for planning
XO : If you are going to do MRP planning the external . say APO or other you can use this type of mrp
Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
What are all the 'sub-components' of production orders?
Mention how mrp (material requirement planning) types are classified?
Explain what is the meaning of exploding a bom?
Suppose the client wants me the vacancy to be displayed on a website as well as ess. How should I do it?
Explain what is “work center” in sap pp and what is the use of data in work centers?
What is mrp controller means?
How do you get the system to update this value from the routing?
How to attach a drawing for a material to bom ? Is it possible ?
Overlapping and splitting, where do you assign?
Consignment matl how will be use
What is 'mps' (master production scheduling)?
List out the basic procedure for dispatching operations in capacity leveling?
How to create object dependencies in a bom for a configurable material?
What is phantom item & sub contracting
Explain the mrp list and their uses.