PD : Mrp planning. explote the BOM upto last level and create the planned oder from finish product level to raw material level
MO : Master schedling planning : the BOM upto next level of the final product.so create the planned order for the final product and create depended reqmt for the next level material
MRp Type P1 or M1:
Ans: THe order proposal that lies within the planning time fence is firmed automatically as soon as its date lies at least one day before the finish date of the planning time fence. The date of new order proposals that are actually created in the planning time fence are rescheduled out to the end of the planning time fence. Therefore, these new order proposals are not firmed
MRP type P2 or M2:
Ans: An order proposal that lies within the planning time fence is automatically firmed as soon as its date lies at least one day before the end of the planning time fence. The system does not create any new order proposals within the planning time fence. That is, the shortage situation is not adjusted within the planning time fence.
MRP type P3 or M3:
Ans: Order proposals that lie within the planning time fence are not firmed automatically. The order proposals required to cover the requirements are moved to the end of the planning time fence
MRP type P4 or M4:
Within the planning time fence, the system creates no order proposals automatically. That is, the shortage situation is not adjusted within the planning time fence.
M4 is to classify the MS parts and P4 is for normal MRP items. BOm will be exploded in both cases to lower levels if procurement proposals created within or outside the time fence.
VB/VM - here , the system do not consider the reqmt (pir or sales order ) , it check the reorder level in the material master and create the planned orde / pr once the stock reach the level.
ND : no planning . so the material will not be consider for planning
XO : If you are going to do MRP planning the external . say APO or other you can use this type of mrp
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
Difference between Manual reorder point and Automatic reorder point.
How do I find which is the recurrent item in a production order? In the missing material analisys I got message MF 331, but the BOM or the production order don'thave any recurrent item Thanks
Explain the uses of the simple maintenance interface?
Is it possible to convert a 'multiple bom' into a 'variant bom'?
What is the difference between pp and pp-pi? Which one is better and how ?
What is Auto GR?
What happens to plan after it has been converted into production order?
What is the data you give in S.O.P screen?
What is alternative BOM, or diff between BOM group and Group BOM?
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
How to insert an inspection checkpoint at the end of an operation?
What is 'capacity planning'?
How does sap know that an operation has components as indicated by the component allocation indicator?
What is the use of data in work centers?
What is MRP procedure