Answer Posted / lava kumar.v
1. Run first set to voltage and frequency and switch to the main bus bar
2.connect at least 25% Load if regulation is poor.
3.set upto voltage and frequency.
4.synchronize phasing up to bus bar manually or automatically
Above mentioned points are satisfied the Dg will ready for operation
* Adjust engine power as necessary if it takes most of the power it will go out over load ,This will bring down the system.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
I WANT HOW CALCULATE TO CABLE FOR WELDING PLANT ?
Why the frequency of ac in india is 50 hz but in some other countries it is 60 hz.
In synchronous motor, how the field current is related to armature current..i know its inversely proportional..but concept wise...i was nt clear....pls help me...
What is the loss of power of transformer 220kv/33kv,63/80mva of % imp12.05 at 80%load
Difference between On Line capacitor and Station Type capacitor.
What is the percentage loss for aluminium wire for HT line more than 11KVa
what is the calculation method to design core and winding of a 200kva 3phase distribution transformer?
what is the maximum permissible limit value of leakage current and leakage counter reading to replace lightining arrester?
What is the name of the winding to which supply is given?
Hi,I am working in abroad for more than 3 years in a company operating with 11kv and 6.4 MW power. I need c licence in India,can I? some other says only i can get if i work for 2 years in india only! anybody kindly clarify by doubt.Thanks
why electron produce magnetic field when it is in motion?
How can we calculate cable size in Low voltage & high voltage
How does HT work & Voltage required?
do anyone out there know where to find a compleete list on acronyms/abbreviations used in offshore electric engineering. MCB - Micro Circuit Breaker, MCCB-Mouldes Case Circuit Breaker, ELCB-Earth Lekage Circuit Breaker, ELMCB- etc.....
WHAT IS MOBILE SUB-STATION? & REALLY BENEFIT IN INDIA