calculate 1-2-4 ration concrete - cement - sand metal and water required for 1 cum
Answer Posted / rajasekhar
C.A = 0.92
Sand = 0.46
Cement = 0.23
Cement = 0.23 × 1440 = 331.2 Kgs = 6.624 bags ~ 7 bags.
Sand = cement × 2 = 331.2 × 2 = 662.4 kgs
C.A = cement × 4 or
Sand × 2 = 662.4 × 2 = 1324.8 kgs
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
Spider cracks occur in beam bottom due to––
I need to constructive work in amaraj batteries
How to get MEP technical,instaaltion & testing data for interview?
significance of specific surface area of particles?
What is absolute coordinates?
How will you Engage Labours on Site?
Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
Explain major differences between routing maintenance and major maintenance.
What are the advantages of cad software’s?
Can we apply curing compound on ceiling (slab Bottom)
Define What is a projection line?
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
how calucate cement sand ratio for plstering
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?