What is Current Shuttering rate (labour + materials) for Columns, Beam & Slab on Item rate basis ?
Answer Posted / yaseen shah
in pakistan current rate is 32 per square feet of centering and shuttering but without materials!
| Is This Answer Correct ? | 3 Yes | 13 No |
Post New Answer View All Answers
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
How can we demolish concrete beams?
how to calculate load for a bungalow and 1column carry how much load if the size of column ,9"*15" .....or total structure load......
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.
what is civil engineer greatest strength and weakness?
afe or not
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
how many BSCs can i connect to the HUAWEI MSC
Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.
What in bending moment, if a moment is free end of cantilever beam?
What is meant by autocad?
What are the causes of building collapse?
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
how much need sand and cement for 1 cft roof construction?
When was the first motorway built in england?