Answer Posted / sahilshah.civil@gmail.com
As per IS 7861 (part I) - Hot weather concreting - Temp more than 40 degree Celsius.
As per IS 7861 (part II) - Cost weather concrete - Temp below 5 degree Celsius.
Normal Temperature between 5 degree to 40 degree Celsius.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
why is M30 grade Concrete use for Foothing & Column M50
to draw bm diagrams for portal frames under different loadings//
what is the difference between tsp & tower
What is absolute pressure? How absolute pressure is calculated?
what pressure the NP2 class RCC pipe can sustain?
what is castigliano theaorem
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
Why the statue of liberty is made of copper?
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
natucher of concrete &type of concrete?
What is gravity flow?
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
how can calculate the compressive strength of concrete cylinder by water cement ratio ?