1) what do you mean by rolling margin of steel ?
2)pls. tell the cut length formula of stirrups as per IS
codes(take out cut length for a beam of 600*300mm with 40mm
cover all sides)?
3)what is the multiplying factor of painting for sand faced
plaster?
4)if your footing is of size1.9*1.6m . what quantity of
length and width you will excavate means what extra
margins you will allow as per IS codes in billing?
Answer Posted / sahilshah.civil@gmail.com
a) Rolling margin is percentage difference between actual weight vs standard weight of steel have same length. - generally vary 2-3%
b)Cut length of stirrups L = 2 X (600-80+300-80) + 15 X 8 = 1600 mm
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Which is the direction of negative angle?
what is the price of a cubic meter of concrete on international market?
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
Whats the meanig of ,'K' VALUE in the case of soil.....
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
Tell me about triple point of water.
How to calculate plastering for elevated water storage tank
significance of specific surface area of particles?
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
what is column foundation
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
How many axes do cartesian coordinate system has?
where can i get the previous question papers for rrb section enginerr (civil)
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?