I want to construct 1850 square ft of rcc apartment , with stilth parking , the site requires 18 ft of pile foundation , the apartment will be above ground parking , can some one guide me about the cost of construction of such structure in Pune ?
Answer Posted / sandeep bhardwaj
cost is thirty laks per floor if piling is used with finishing
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
What is the difference between Hinged and pinned in Column ends
How high should the water tank be to provide a 60 psi at base of this water tower?
How much material is required for constructing a 2 Lane 2Km rigid pavement road
five benefits of using standard terminology in the measurement process
why we use aggregate,sand with cement in concrete?
What is the name of this multiplication factors ?
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
What is modular elasticity?
225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.
Exterior Joints,define
how much need sand and cement for 1 cft roof construction?
How to calculate the crank rod in slab
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
Define What does civil status mean?