For Nominal Mix 1:4:8
Concrete Grade : M 5
| Is This Answer Correct ? | 5 Yes | 3 No |
Post New Answer View All Answers
What is the distance between railway tracks?
why demand factor less then 1 ?
Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??
How much cement and water required for cement selery????
what is the most suitable foundation when construct a bird watching tower in a marshy land
Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?
An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet
what is w/c ratio in dry lean concrete for m10 mix design
Why reinforcement done in shorter span in two way slabs