Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

230mm thick brick wall 10rmt length and 4.1 mtr high brick wall. tell quantity of cement,sand,brick required?
Also tell me labour required to complete brickwall in 2days

Answer Posted / vikas d v

size of brick =200*100*100
1 brick= 1/(0.2*0.1*0.1)=500bricks/cum

if he has nt given thickness =1/(0.2*0.1)=50/sqm
41sqm=50*41=2050bricks
mortar thickness 10mm
0.2*0.01=0.002
so mortar req =2050*0.002=4.1sqm
let us take 1:4 brickwork
cement=1/5*1440/50*41=5.76bags
sand=4/5*1.3(bulking)*41=42.64sqm

Is This Answer Correct ?    1 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

about higyway engineering

4431


how to calculate the weight of concrete

1624


how to calculate the scour depth

2958


What is the cost difference between site mix and ready mix concrete per cubic meter

1908


which steel is better for residential building tmt steel or hysd steel

2268


What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet

2544


when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?

2168


How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?

2048


can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density

2149


Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire

1649


How do we calculate the power of centrifugal pump?

1185


pile load testing procedure

2236


please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?

1564


How do you change a dimension value in solidsworks?

1249


How to calculate sand , cement quantity for 23mm thk brick work(10x10)

5203