During estimation of walls of superstructure...which unit we'll use with quantity.cube or square
Answer Posted / vikas d v
depends if u knw the thickness u can use sqm if u dono u should use cum
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
How to calculate 1 brss for RCC work
How to determine spacing of bars in slabs or beams
Wat is meant by Aecron brick?
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
What is the method of soil replacement test?
How cracks in concrete can be avoided?
construction workers how much time take one work or qty
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
explain fie benefits of using standard terminology in the measurement process
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
what is the max. area can we apply the plate load test ?
what is the calculation of raw material for 0.35cum of m-15