calculate 1-2-4 ration concrete - cement - sand metal and water required for 1 cum

Answer Posted / sahilshah.civil@gmail.com

Cement : 6.6 Bag/Cu m
Sand : 0.51 Cu m/Cu m
Metal I & II : 0.98 Cu m/Cu m

Is This Answer Correct ?    7 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to nfind out the specific gravity of sand.aggregate,water please help...

1694


Rate analysis of Vitrified tile in cement mortor 1:3

3941


What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil

2270


Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem

2330


How much is the cover for slab?

740






why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..

2087


What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.

1567


CAN WORK WELL UNDER DEAD LINES OR PRESSURE?

1501


How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?

1497


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2396


What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.

1993


how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?

1351


what is idealized curve for concrere and steel

1846


What is the zero value in quantity surveying

2020


List out the potential risk factors for workers on the construction site?

652