calculate 1-2-4 ration concrete - cement - sand metal and water required for 1 cum
Answer Posted / sahilshah.civil@gmail.com
Cement : 6.6 Bag/Cu m
Sand : 0.51 Cu m/Cu m
Metal I & II : 0.98 Cu m/Cu m
Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
how to nfind out the specific gravity of sand.aggregate,water please help...
Rate analysis of Vitrified tile in cement mortor 1:3
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
How much is the cover for slab?
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?
How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
what is idealized curve for concrere and steel
What is the zero value in quantity surveying
List out the potential risk factors for workers on the construction site?