How to fix steel in rectangular footins?
I.e first along the length or first along the width??
Answer Posted / n.r.gupta
first place the steel in breadth i.e. in shorter span and over it in longer span.
| Is This Answer Correct ? | 7 Yes | 1 No |
Post New Answer View All Answers
how many cement used in single story residential building per sqft
What is absolute pressure? How absolute pressure is calculated?
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
how u design STAGING for Superstructure in BRIDGE construction?
How to calculate woden area in sft and Cft
The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it
How many mortar required for Brickwork of 1 Cu.m works??
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?
What is gravity flow?
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
What are the composition of a landfill?
what is the 0 value in quantity surveying
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
what is escalation?how it is done?
What are the responsibilities of a site manager?