Answer Posted / pramod
1 jack per sqm for calculation and its thumb rule
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
What are the steps involved in the concreting process?
How to calculate the crank rod in slab
Which are the top apps for you civil engineering?
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
What are the uses of groynes?
What does a construction cost covers and what does not?
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
calculate the quantity of water for 1:6 cement mortar
Which is the direction of negative angle?
150mm bricks size how many use 4.14 m3
Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....
strength of bitumen concrete with 80-100 & 60-70 grade bitumen
What you understand by building codes?
Calculation of curtain wall of box culvert