Answer Posted / structural engineer
these are nothing but the lines made by points having the same stress.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
 What is difference between limit state and working stress method? How it is applies in building structure.
How to compute minimum number of columns required for a site from area of site?
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
questions with answers to face an interview of an civil engineer regarding RCC buidings
material used for mendrel use to bend epoxy coated rebar
load combinations how many types for staad design purpose?
What quantity of 1.0 m3 bricks required?
what"s the sort of beams?
What is chemical composion test
Explain the different types of building contracts?
how much used soil in 1 brick of standard size?
door and window wood work calculations and different methods
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick
Define What is Civil Engineering?