Answer Posted / pankaj balyani
ambuja composite cement
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
How to find out kg per Sft ?
what are the Task work of different labour.?
if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column
how i can calculate the actual nos & size of steel to make 1000sqft. x 3"thick slab
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
For Wet Mix Mecadam design what is Optimum moisture content
Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......
why +1 to be followed for calculating the no of bars in BBS. Please explain
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
What will you do if a portion of load bearing wall collapses under your supervision?
What is gravity flow?
How many square meter can a worker/labor demolish a structure per day?
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
What is the formula for figuring out how many gallons of water are in a pipe by the foot?
How do you maintain water pressure?