What is OLTC in transformers and what is its function?
Answer Posted / tanmoy
OLTC is an Onload Tapchanger. It is connected through the tapping leads to the regulating winding of the transformer.Most of the transformers have OLTC connected to the Primary winding of the transformer. However, there are tapchangers which supports bi-directional power flow, hence can operate in both primary/secondary windings of the same transformer depending on the direction of power flow. For an instance,if a step-down transformer being used as step-up transformer then based on the direction of power flow, the OLTC connected previously to the primary winding of the transformer (step-up case) will be now connected to secondary winding(step down).
Hence, it will be viable that we use the phrase regulating winding of the transformer instead of using primary & secondary winding of the transformer.
Nevertheless, the voltage regulation is achieved by utilizing desired number of turns of transformer windings segregated in taps, which can be selected as per need of required voltage.
Tapping arrangement is further bifurcated into different schemes..viz., Linear, Reversing & Coarse-Fine.
Hope, you will find the above explanation in order. Request for feedback folks.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What are the uses of lead compensator?
What type of pipe material G.I or M.S is used for sprinkler system?
Is a contactor (or master relay) required between incoming lines and a VFD? The question goes to safety. If a contactor were used before the VFD and an e-stop engaged then the motor will coast to a stop (i.e. VFD loses power) instead of stopping much faster if the VFD braking fucntion were used. It would make more sense to keep power on the VFD.
10 Mtr Hight of Lighting Arrestar how much area coverd??
What is measurement?
Give idea about General Engineering. From which book i can study this topic. Pl. reply me via email. My email is ravi@bhelhwr.co.in, also give the name of book/website, from where i can prepare it.
how we control automatic generator i'e with to supply (main supply and local generator) when the main supply was break to supply the local supply automatically to begin supplying power.I now this control circuit is the combination of contactor time delay contactor switch and overload relay .but my question is how we combine those component thank you
i need to now what will be the cable size to the following load, transformer to distribution panel distance 110m, load 1000kw, voltage 400v, pf 0.85, permissible voltage drop 2.0%, overhead line, atmospheric temperature 35 degree c.
Does magnetomonopoles exists? one maxwell equation strongly suggests no, but how about their existance in plasma?
Explain The Application Of Storage Batteries?
How many wall/floor flange will i use in bus duct system if we have in our design a 35th floor building.
Why is the starting current high in dc motor?
What is genrally the % Impedance of a Dg set? How can we calculate Earthing conductor size for a DG set?
PLZ SEND ME SOME UNIQUE PROJECT OF ELECTRICAL ENG (B.TECH)
Haw to check conductivity of budbar