You have casted a column above your footing, and you found out
it is off its location by 5cm. What would you Do?
Answer Posted / suresh baria
Bring it to notice of structural engineer, Let him to give the corrective measure as he is the design auther and he is going to give the stability certificate.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how to conversation of all construction material in to brass
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
RR masonry rate analysis
How did the romans get water up hills using aqua ducts?
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
a butt weld is specified by
why we are useing plastic under the lean concrete?and whts the advantage?
how to calculate load bearing column
Why does the pressure increase under soil?
what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?
What is the effect of a building collapse?
what is the criteria for the finalisation of pavement thickness in road project?
Which code is used for tor & tmt steel bar?