You have casted a column above your footing, and you found out
it is off its location by 5cm. What would you Do?
Answer Posted / suresh baria
Bring it to notice of structural engineer, Let him to give the corrective measure as he is the design auther and he is going to give the stability certificate.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How will you Engage Labours on Site?
What is geopolymer based concrete?
How many axes do cartesian coordinate system has?
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy
I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?
Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.
load combinations how many types for staad design purpose?
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
what is Bearing Capacity,How to determine it?
Define What is the tallest man made structure in the world?
What is the difference between linear dimension and aligned dimension?
How to plan a project
How to calculate Volume of Wet cement concrete for a specific grade?
what is tension & compression of steel bending.