You have casted a column above your footing, and you found out
it is off its location by 5cm. What would you Do?
Answer Posted / suresh baria
Bring it to notice of structural engineer, Let him to give the corrective measure as he is the design auther and he is going to give the stability certificate.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.
what is hydrostatic paradox?
How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.
What is unit weight of normal concrete?
punj loyed and sapurjl palanjl
What is the l/d ratio of cantilever beam?
For what purpose bedding is used under storm water drains, explain?
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
what is mc arther pile?
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
Curvature ki quantity kaise nikalte hai pls give me ans... curvature canal ka hai
How to make a c++ program that converts any base to base 10?
What will be the exam pattern and syllabus for j.e post of haryana staff selection commision? Advt no. (02/2015) Some people says it would only be objective type question papers while others say it would be same as ssc (1 objective,1 conventional) ?? Please answer this question it is needfull to all.
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations