You have casted a column above your footing, and you found out
it is off its location by 5cm. What would you Do?

Answer Posted / suresh baria

Bring it to notice of structural engineer, Let him to give the corrective measure as he is the design auther and he is going to give the stability certificate.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?

1406


What is the release of lien?

705


how many tonnes equals to one cubic feet?

1209


how to calculate the weight of concrete

1041


how i can tak Quantity of mortar in block work

1992






how many running meters in one kilogram of 4mm pvc coated chainlink fencing

651


can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now

1677


what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing

1885


how can calculate the compressive strength of concrete cylinder by water cement ratio ?

1241


if the nitrates more than 45mg/l in water lead to disease then what is it called

2356


B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS

2545


Explain what are the problems one might face while having a Cantilever balcony?

838


How much for the BRC lapping in full yield and half yield < and which table to get it ?

2042


How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?

1450


can any one explain bar bending schedule of bems and columns and slabs ??

1428