Answer Posted / esantharaj.c
m25=1:1:2
1/4=.25
.25x1440=360kg
360/50=7.2 bags per 1m3
| Is This Answer Correct ? | 9 Yes | 5 No |
Post New Answer View All Answers
how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?
what is flashing?
what is the effect of duration of earth quake on framed structures ?
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
What is OSHA compliance?
how to calculate the size of triangular ring in rcc column?
how to absorb to site basic corrections? which are the important correction?
how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm
why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.
how much quantity of cement,sand and water required for 1 sq feet flooring work .
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
what is called Bulk Density of aggregate?
What do you meant by gui?
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
Advantage of Aluminum form work in terms of activities can be skip and cost too