Answer Posted / adeel
to avoid cracks that are generated by heat of cement.
Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?
what is diversion?
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
Formula for calculation volume of essentric footing
all technical question
03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1
How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?
what is the painting co efficient of slope roof tiles?
How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
material used for mendrel use to bend epoxy coated rebar
types of laps in column