why IBD Vent is kept at higher elevation than CBD ?

Answer Posted / tarun

intermeediate blow down is higher elevation than cbd for releasing high pressure to air vent to atmosphere

Is This Answer Correct ?    1 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.

2760


Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.

2974


dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job

2070


some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor

1948


what is the difference between compensated & normal drum level in boiler drum?

1286






DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

510


can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525

1276


our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....

1194


operation

1371


How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.

1822


How to calculate power press toneage

1548


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

1765


Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.

1880


what is the basic use of power plant in equipment

1225


procedure of how to generate power in solar plant.

1373