please know me that required quantity of cement , sand , water and bricks for 1 cub meter of brick work
Answer Posted / np
in 1:6
cem .86 bag
sand .18m3
Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
TELL ME THE EQUATION FOR OGEE SPILLWAY
Who designed the city of washington dc?
what is the formula to find the diagonal shape stirrups?
What is the usage of zoom command?
rate analysis for cement pointing 1:4 , for 100 sq m
what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????
residential buildings,mixing of concrete,structural,construction material,site handling.
What is the use of mirror command?
What are the different types of foundation?
What is a bearing capacity of soil?
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
Which is the latest version of solidsworks?
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial