Answer Posted / samiullah
To avoid the corrosion against the soil when steel get contact with soil reaction starts that is the reason pcc is laid
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
important question on stones
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
which has high compressive strength between hollow block and brick masonry?
What is the difference between absorption & adsorption and sorption?
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
How to find beam R/F cutting length
what is the use of water bar in water tank and is this an extra item in estimate?
Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
why we create short columns under grade slab?
length where bent up is made in slab of bridge from one end
Is there the dry coefficient of cement is constant?
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil