Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the technical name for aggregate stored in
trepizoidal shape near railway station.

Answer Posted / suresh phadke

Ballast

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

in the earthquqke the profile of water on dam is parabolic or not

2003


sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience

2526


What is pre-stressed concrete?

1174


which software is better for design and analysis of buildings (stadd pro ) or (Etabs)

2358


For what purpose bedding is used under storm water drains?

1166


how to compute slab reinforcements on step by step procedures??

5862


What is M40 _ TOR - EQ and B.F.S

2524


How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work

3677


I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.

2098


how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm

2095


Define line type?

1166


Different sizes of Hollow blocks and its weight. Thanks.

2462


what energized you to complete your course?

2476


A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L

2304


Volume of 25kg putty bag & 40 kg putty bag volume??

2102