Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to calculate the volume of water in the water tank
(5'x5'x5')? what"s the formula?

Answer Posted / majid niaz

Majid Niaz. i think you are designing a tank which is rectangular
Length of Tank = 5 ft
Width of Tank = 5 ft
Height of Tank =5 ft

Volume of Tank = ?

Vol. of rectangular tank = L x W x H
= 5x5x5
= 125 ft3
convert this cubic ft to m3= 125/3.28x3.28x3.28
= 125/35.29
m3 = 3.54
Now calculate vol in liter= 3.54x1000
= 3540 Liter


This is exact answer.

Thanks
Engineer Majid Niaz

Is This Answer Correct ?    6 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the difference b/w full length and cutting length?

2220


Formula for calculating the volume of bulb in underreamed pile

5012


What is the use of water table & Kreb stone for drain

1847


Volume of 25kg putty bag & 40 kg putty bag volume??

2050


how to find ssm in foundation?

1933


How can i display 5 asterisk and another 5 asterisk )?

2504


what is concrete canvas?

2287


how to caluclate sienerge qty in construction in ap

2395


Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??

2707


Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever

2244


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

2118


how to calculate testing date

1675


what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????

2067


What is quantity of cement and sand required for 2000sqft of tiling?

2844


in the earthquqke the profile of water on dam is parabolic or not

1956