Post New Answer View All Answers
how many litres of enamel paint required for 5000 sft of site??
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
Define polar co ordinates.
how to prepare site mix design
3. What are the disadvantages of your present job, things you do not like about it?
column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial
at what pressure ply-wood is obtained by gluing wooden sheets
Define What happens to Load at yielding ?
What is difference between code and standard and specification?
What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?
Please let me know what is the simplest way of Calculating Mix Designs
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
Which is the direction of negative angle?
where can i get the previous question papers for rrb section enginerr (civil)