Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

which software better design in structure design or Rcc
design(STAAD PRO,TEKLA STRUCTURE)

Answer Posted / shujath

hello Shamsul, can u send me this ESTEEM software

And I want to know about it more.

shujathishaq@gmail.com

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Aptitude, reasoning, quants, verbal and technical question

1557


i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh

2401


one steel fixers how much ton steel fabrication he will do same how much tone he will binding?

1950


How to calculate woden area in sft and Cft

1572


What is the Roll of Water Bonding under VDF road?

2654


Define What is the tallest man made structure in the world?

1248


how to calculate testing date

1675


what is the cost of rcc roof casting of 400 sq. ft. in kolkata

3750


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

1806


hai, kindly send anyone for output workers format details for construction project in foundation to finishing.

1513


please send me bhel questions on rupesh.017@rediffmail.com

2698


What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m

2188


What you understand by richter scale?

1207


What is the difference between undo & redo?

1256


asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream

1933