Answer Posted / lokesh vrushabh
its not 78.5kg/m3, it should be 7850kg/m3 or 78.5x1000 kg/ m3. it is density of mild steel and this value differ for hysd bars.
| Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
How to find beam R/F cutting length
what is directivity effect?
how we check the thickness and line of ceiling plaster.
Which purpose we use deck anchor in bridges?
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
How do you calculate the power of centrifugal pump?
IS code for Rolling Margin of steel
what is yield and tensile strength of steel, if steel has yeilding strength of 60 psi than how much its tensile strength?
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
I want to join bhel because
Why does the pressure increase under soil?