Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

WHEN A RIVER STARTS MENDERING WHAT CONDITION WILL OCCUR?

Answer Posted / veeramurugan

During the mendering action of river, shape of river is increased from original pathway and that area attains a lower velocity and by silt is deposited in that place.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?

2187


quantity of material needed for rubble stone masonry for 1:4 and 1:6

1825


I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.

2555


what is the coefficient for running feet to cft coversion both area and price

2392


psc girder detail

3163


Who built the sears tower?

1204


Basic questions of civil engineering

2067


How is improve my knowledge in construction industries....

2128


How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?

6747


What tor stands for in tor steel?

1068


How much quantity of rod binding work by a rod binder per day

1493


how much required strength of cement concrete bricks(size 230x115x75mm)

1985


difference between fc and fc'?

1737


How to testing voids of filled aggregate in bitumen mix design

1916


How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton

2114