Post New Answer View All Answers
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh
how much cement sand n bricks required in im3?and how much in plaster?
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
what is idealized curve for concrere and steel
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
WHAT DLC DESIGN IN CONSTRUCTION
what is m30 in concrete tiles
how many type of admixtures for water stored structure?
Suppose you planning to paint newly fabricated workshop building made of structural steel of 10 tons total mass. How many litters paint primer for 1 coat and 2 coat of top coat?
What is Grid floor and mention its advantages ?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
psc girder detail
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.