What will be compressive strength of concrete casted in PPC in the 7 days period with M20 grade.
Answer Posted / sasank samantaray
14 Mpa as the strength should be 70% of 28 days strength.
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
How to take labor charges for construction of 1cum of concrete?
Give me an example of a time when something you tried to accomplish and failed.
how to take concrete quantity for precast segment for viaduct project?
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
how to estimate material requirement for an area of house in square feet?
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
Why are pull-out tests performed for soil nails?
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
Is there the dry coefficient of cement is constant?
What tor stands for in tor steel?
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
what is mean by reestimation?
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet