What are the special criteria under which FD fans are
switched off during MFT.
Answer Posted / kundan kunal
post purge trip
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.
dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job
What is difference between secondary Air & Tertiary Air and Their use.?
can dp type level transmitter work in under vaccum condition
How do you consider that you can improve and what assistance do you need to achieve this
What is LB-SR.
what is the trip circuit supervision in an electrical meaning?
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525
By any way can we increase the B check hours from 300 to 500
what is the difference between compensated & normal drum level in boiler drum?
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
why do you consider yourself a suitable candidate for this position
what does mean by kva rating
some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor