what is the proportion of stones and concrete inplum concrete??
Answer Posted / abdus
60% rubble and 40% concrete
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
How can we convert weight batch to volume batch for m30 mix
2. What are the advantages of your present job, things you like about it?
What is Density of cement, sand & aggregate ?
what are the duties of Site Engineer in work site?
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
Why are pull-out tests performed for soil nails?
1m square 20mm plastering how much of water need curing work
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
what energized you to complete your course?
When was the first motorway built in england?
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???