Answer Posted / madhavan
1m3/35.315cft
Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
what is diffrence between catchment area,watershed and basin?
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
i need gate exam civil engineering question papers with answers
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
use ofr concrete as per grade ?
how much tempareture are required to make liquid state of pid leed
what motivates you to do a good job
How can we make a hole in a solid rectangle using solidsworks?
estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?
what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15
what is E
How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?
In jack arch floor, the rise is kept?
how do you calaculate the total steel quantity of an rcc building using thumb rule?
where can i get the previous question papers for rrb section enginerr (civil)