In field side transmitter voltage droping here no loose connection then what will happen?

Answer Posted / carl_ellis

The minimum required loop voltage depends on the voltage needed to drive 20ma (or 21.5mA if fail-safe high is used) through the total loop resistance.

Even if the power supply voltage sags/drops slightly, it is still possible that the loop will function properly, because it depends on the actual loop resistances and the lift-off voltage required by the transmitter

If there is not sufficient loop voltage, it will become apparent when the transmitter fails to go above a certain milliamp output, because there is insufficient voltage to drive more current through the loop's total resistance.

In some cases of low loop voltage, a field transmitter will cycle on and off, re-initializing each time it fails to push sufficient current because it is voltage-starved.

If the loop wiring is sized properly, then a voltage drop is likely due to
- a bad connection in junction box
- in some cases a ground loop from damaged wire insulation
- adding too many additional loads - more transmitters than the power supply is rated for
- failing power supply
- adding another device in series in the loop, like an indicator, recorder, or I/O module input that pushes the total loop resistance too high. Carl Ellis
Measure First

Is This Answer Correct ?    6 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how the arrangement of equipments done in control room

1600


Decibel.

2100


what about your moleg in pogrees with company

1821


which type inter lock use in petrochemical refinery,and oil & gas?

2641


Why the ammonia and Nitric Acid level indicators is with millimeter ? and What is the conversion form millimeters that level indicator indicate to weight ?

1227






please any body have most important data for study for saudi aramco test of instrument QC thanks email shahnaveedullah@gmail.com

1249


field bus transmitter calibration procedure tell me

1365


how to commission furnace ( water heater)

1524


What is instrumentation technologists and mechanics?

592


What is the calibration procedure of Drum level transmitter if range is 0 to -400 mmh2o in lab?

1689


Define cryogenic?

732


Explain how thw analog to digital converter works with the circuit diagram

2190


any body who gone thru recent iocl interview.INSTRUMENTATION questions. I need.

1955


Hi, I am Newely Joined in Construction company instrument engineer? Any one can Plz tell me How can I advanced preparation for Releated Engineering and construction Documents?

2160


how is work pressure switch& level switch?what is the principle of this?