Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Wat is meant by OLTC?

Answer Posted / mothilal

On load Tap changer, It is used for Withstand the variable voltage from EB side.

Is This Answer Correct ?    8 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How are load losses and no-load losses measured at site in a DG set?

1786


Sir, I m 3rd year student 4m DCE and want to do internship in siemens or l&t or any other mnc related to electrical engineering. please tell me the procedure 4 same and oblige me

2030


Calculate torque developed by the 3-phase, 5 H.P., 4 pole induction motor runs at 1500 rpm A 23 N-m B 21 N-m C 10 N-m D 0 N-m

5256


From what on-site components does the HT panel monitoring the bus-bars in a 11kV system take inputs?

2075


how many load we can take for lighting

2322


how to calculate the change over time for star delta starter for different KW motor?

4273


HOW TO CALCULATE EARTHING SIZING?

2236


what is the circulate the diesel in DG in side pls tell parts name and picture with circulate the diesel

2039


Define availability (operational)?

1206


Rules and standards of electrical control wiring ?

1216


why does a dc machine has high efficiency while working as a generator than as a motor ..

2049


bitumar

2345


Consider three heater bank connected in 3 phase star with neutral.Each heater bank connected in each phase.So each phase get 230 volts supply.my question is,during balance condition, current flow in neutral or Not

1696


why generator efficiency is more in swinburnes test?

2259


A 3-phase IM is supplied from 50 Hz system. It runs at speed of 1440 rpm and slip equal to 4 %. Calculate number of pole pairs. A 1 B 6 C 2 D 3

2065