What is difference between PLC and SCADA
Answer Posted / rajendra
plc: programable logic controller
by plc we've control monitering and veriable the value also change the programming acording to requirement of process.
scada: supervisory control add data asquistion.
by scada we've control,monitoring and display the system but not change the program.
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
why Y CONNECTION IS BETTER INTERMS OF EFFICIENCY AND P.F FOR A LAOD LESS THAN 40% AND WHY AFTER DELTA IS BETTER FOR > 40%
how to calculate fuse rating for a motor
Why syn. Generators are used for the production of electricity?
Please brief what is sinewave
How to select circuit breakers rating eg. if i select a circuit breakers of capacity 40 amps DC with operating voltage 28 volts and if i what to use same circuit breakers for 300 Volts DC application what is the current rating of this circuit breakers.
Graphs of measuring power and speed on dc motor
Hi Friend I am used multimeter to measure the voltage between R Phase(SS1) to R Phase(SS2). In SS1 is connected with UPS loads. But I am getting voltage between these 2 R Phases. Please give some idea friend
Why use the vcb at high transmission system ? Why can’t use acb?
During underground cabling in landscape area what did we cover the cable with to prevent the electric shock & protect the cable?
What is Negative Potential Bias
When can we take Neutral as common neutral link?
Give details of your interested designation, the post you are interested to serve the company better and explain why you think you can serve the company better in such position if employed?
In a flange coupling, the flange bolts are designed for
How many types of probe used in cro?
How to calculate per unit impedance of transformer?