Is it necessary to check out the project file when I only want to edit one of the forms contained in the project file?
Answer Posted / sonakshi
If you have a ActiveX control embedded in your form, you have to check out the project file also.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What about other product integrations?
How to Check Out for Updating?
Can I use VSS on Unix or Mac systems?
What is Multiple Checkout?
Is there some way to get a list of errors from Analyze?
How can I use SourceSafe to version stored procedures with Visual Studio 6.0 and SQL Server 7.0?
Which is the best product for source controlling compare to vss for version controlling?
How can I lock and unlock the VSS database prior to running Analyze or backing up the database?
Is there some way to automate email notification when of VSS changes?
Is there a way to enable easily switching between multiple source code providers?
Does VSS 6.0 support NT’s built-in security?
Is VSS 5.0 compatible with a 4.0 database? Do I have to upgrade all users to the new version? What about 6.0?
How can I access VSS from a remote site over the Internet directly of via a web portal?
Does VSS OLE Automation support administrative functions?
How do I apply a label to an older version of a file?