What is the exact meaning for under & over reinforced beams
& when they have to used..
Answer Posted / asif imam
When the Ast, design moment , permissible stress are less than that of maximum condition or balanced section is known to be under reinforcment condition.
Where as when the Ast, design moment, permissible stress are more than that of maximum codition or balanced section is knwon to be over reinforcement codition of a section or beam.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
what radial pressure, the NP2 class rcc pipe can sustain?
Basic questions of civil engineering
pls tell me about method of cutting length of ties column
Define What is a projection line?
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?
What is kn measurement?
What are the important hardware systems used for cad?
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet
what is the function of GSB all class ?
How to calculate paint drums per meter square
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
How much cement and water required for cement selery????
How do you maintain water pressure?