Answer Posted / xevier
Since hydration of cement is exothermic, evolved heat is harmful to mass concrete and may cause thermal-shrinkage-induced cracking due to heat build-up in the concrete, frequently occurred in hot climate country. Heat generation can be reduced by replacing cement portion with pulverized-fuel ash, like PFAC, modification of clinker constituents, and fineness of cement. A reduction in temperature will retard the rate of hydration and so further restrict the rate of heat generation and reduce thermal shrinkage.
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct
explain five benefits of using standard terminology in the measurement process?
What materials were used to build the golden gate bridge?
what is the steel difference between np-2 and np-3 pipes and weight also
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
what is right & short method of measurement of slab&beam
IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN
What are the main reasons for conducting pull-out tests for soil nails?
how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.