thermal power plants in steam using inlet of turbine.inlet
of turbine pressure and flow is same as boiler feedpump why
not use direct to turbine?

Answer Posted / raja

U need a feed pump of the size of the alternator u have, to make this possible. In other words the alternator can only produce the power of your feed pump only. 

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

operation

1381


can dp type level transmitter work in under vaccum condition

1543


By any way can we increase the B check hours from 300 to 500

1699


What is difference between secondary Air & Tertiary Air and Their use.?

1479


how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?

1235






why do you consider yourself a suitable candidate for this position

6982


can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525

1278


why airtel use + 24 volts and other operators use -48 volt

2108


We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?

1435


dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job

2072


procedure of how to generate power in solar plant.

1379


What is surging in a centrifugal compressor ? How it occur's ? How is antisurging done ?

1938


explain how the third harmonic content of the magnetising current affects transformer design

2773


what is restricted earth fault explain in details

1628


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

1771