Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why synchronous motor has zero starting ?

Answer Posted / marjo

because the relative velocity b/w the stator and rotor mmfs is zero.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is transient stability analysis means?

2082


3 phase Motor will be given 2 phase after 2 to 5 second we given 3rd phase so Motor Run sum-time in forward or sum time run reverse direction. All time phase sequence is not change. Why motor run in reverse direction? Please Explain........

1898


A 3-PHASE TRANSFORMER IS USED TO STEP-DOWN THE VOLTAGE OF A 3-PHASE, 11KV FEEDER LINE. PER-PHASE TURNS RATIO IS 12.FOR A PRIMARY LINE CURRENT OF 20A, CALCULATE THE SECOUNDRY LINE VOLTAGE, LINE CURRENT AND OUTPUT KVA FOR FOLLOWING.A)STAR- DELTA.B)DELTA-DELTA.

2988


Installation resistance for whole installation of 16 kva & 25 KVA DTRA a) Between each conductor b) between conductor to earth c) installation resistance for each apparatus, each conductor to earth d) earth resistance for the system of earthing

1848


if we have a industrial load of 400 kilowatts with 415 volt AC then how much total harmonic distortion (thd%) should be acceptable for steady power system.

1936


Explain cmrr?

1065


how to select the automotive wire size by mathematical calculation. for xenon headlamp with ballast. the ballast given data voltage 10-17v,current permenant 6amp, run up phase is 15amp, peak at swicth on max 400micro sec is 40amp.the sum of cable resistance is 150mohm.please provide referenc document if any for relating the peak at switch on current,time & wire wire size

2316


WHY CBCT USE ONLY IN Y PHASE NOT OTHER PHASES

2043


What is servo lock in CNC how they work and if any parameter for them in CNC machine

5301


what is the difference between RMS & TRUE RMS VOLTAGE

2871


sir i want previous entrance exam papers for written test

2077


HI SIR, AM PREPARING FOR RRB FOR SECTION ENGINEER POST. PLZ SEND ME THE PREVIOUS QUESTION PAPERS AND HELP ME. I HAVE NO ENOUGH TIME MY EXAM DATE IS 22ND JUNE.... MY EMAIL ID IS nalla.amarnath@gmail.com

1881


working principle a.v.r. ?

2337


how to calculate the change over time for star delta starter for different KW motor?

4174


How to reduce -234126219.6403 MVAr generation and by what?

1575