Answer Posted / balaji p
M20 means mix design 20
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is quantity of cement and sand required for 2000sqft of tiling?
what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
What is difference between code and standard and specification?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing
What is the zero value in quantity surveying
What is the difference between built area and super built up area?
where i can get material costs on weekly basis
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
What are the applications of the modulus of elasticity?
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
What is different between DI Pipe and CI pipe?
how to tie 10 legged stirrups
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?