how much steel in one sq m slab?

Answer Posted / er.ssmanian007@gmail.com

125KG to 150KG /PER CUM CONCRETE

Is This Answer Correct ?    4 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

roll of DLC in road constructions

1419


5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?

8493


How to calculate carrying capacity of the existing water supply trunkmain

1813


i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??

1648


what is shuttering co efficient?

1307






please briefly explain calculating or estimating steel quantity for a RCC column?

1448


In csae of hume pipes NP stands for Non Pressure bur what does it really mean?

1822


List out some of the software program that can be useful for architect?

684


What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?

1705


What is the use of extruded feature in solidsworks?

779


HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS

4230


1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.

1693


What is the Hardness of M-40 grade concrete, general and theoratical

1669


What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?

1679


How to find out kg per Sft ?

1812